RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027483 - Archived data from Fri, 05. February 2021 10:51:12 CET


This is all the information about APD 2420027483. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027483
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6545717 V     T = -25 °C: 343.5238708 V
Voltage for Gain 150: T = +20 °C: 386.4575921 V     T = -25 °C: 350.8719988 V
Voltage for Gain 200: T = +20 °C: 390.8133079 V     T = -25 °C: 355.0011928 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.587642233 V-1     T = -25 °C: 4.933359326 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.794400437 V-1     T = -25 °C: 9.821729375 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74448684 V-1     T = -25 °C: 15.1828608 V-1
Break-through voltage: T = +20 °C: 405.9266853 V     T = -25 °C: 369.9064236 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:32:17 CET oafedulidis Assigned to capsule by script
27. Aug 2021 11:15:58 CEST oafedulidis Updated box and position via API.
21. Apr 2021 14:49:13 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:12 CET jreher Updated box and position via API.
03. Feb 2021 18:17:18 CET jreher Updated box and position via API.
11. Aug 2020 17:23:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:06 CET jreher Updated APD location via API.
25. Nov 2019 17:12:56 CET jreher Updated box and position via API.
04. Jul 2019 11:09:45 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:21 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:16 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:30:21 CET markus.moritz
03. Jan 2019 00:11:55 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.