RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027453 - Archived data from Wed, 03. February 2021 18:17:16 CET


This is all the information about APD 2419027453. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027453
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.1 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.9851678 V     T = -25 °C: 340.9578759 V
Voltage for Gain 150: T = +20 °C: 383.8093615 V     T = -25 °C: 348.3105027 V
Voltage for Gain 200: T = +20 °C: 388.1813607 V     T = -25 °C: 352.4551459 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.530058156 V-1     T = -25 °C: 4.835342023 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.674941306 V-1     T = -25 °C: 9.651600478 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63365364 V-1     T = -25 °C: 14.9446221 V-1
Break-through voltage: T = +20 °C: 403.1742062 V     T = -25 °C: 367.7730218 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:49:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:10 CET jreher Updated box and position via API.
03. Feb 2021 18:17:16 CET jreher Updated box and position via API.
11. Aug 2020 17:23:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:05 CET jreher Updated APD location via API.
25. Nov 2019 17:12:55 CET jreher Updated box and position via API.
04. Jul 2019 11:09:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:15 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:55 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.