RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027452 - Archived data from Fri, 05. February 2021 10:51:10 CET


This is all the information about APD 2419027452. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027452
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5388916 V     T = -25 °C: 343.4583839 V
Voltage for Gain 150: T = +20 °C: 386.3659911 V     T = -25 °C: 350.8494065 V
Voltage for Gain 200: T = +20 °C: 390.717364 V     T = -25 °C: 355.0228625 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.401252281 V-1     T = -25 °C: 4.695629597 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.322797265 V-1     T = -25 °C: 9.366216522 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3957467 V-1     T = -25 °C: 14.51346186 V-1
Break-through voltage: T = +20 °C: 406.4659797 V     T = -25 °C: 370.6387814 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:01:48 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:20 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:10 CET jreher Updated box and position via API.
03. Feb 2021 18:17:16 CET jreher Updated box and position via API.
11. Aug 2020 17:23:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:05 CET jreher Updated APD location via API.
25. Nov 2019 17:12:55 CET jreher Updated box and position via API.
04. Jul 2019 11:09:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:15 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:26:07 CET markus.moritz
03. Jan 2019 00:11:55 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.