RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027446 - Archived data from Wed, 03. February 2021 18:17:16 CET


This is all the information about APD 2419027446. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027446
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.2720024 V     T = -25 °C: 341.2885807 V
Voltage for Gain 150: T = +20 °C: 384.1023526 V     T = -25 °C: 348.6347032 V
Voltage for Gain 200: T = +20 °C: 388.4610269 V     T = -25 °C: 352.7827942 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4540186 V-1     T = -25 °C: 4.741302497 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.558168324 V-1     T = -25 °C: 9.464604429 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49398541 V-1     T = -25 °C: 14.68017869 V-1
Break-through voltage: T = +20 °C: 403.9423684 V     T = -25 °C: 368.0480814 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:49:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:09 CET jreher Updated box and position via API.
03. Feb 2021 18:17:16 CET jreher Updated box and position via API.
11. Aug 2020 17:23:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:04 CET jreher Updated APD location via API.
25. Nov 2019 17:12:54 CET jreher Updated box and position via API.
04. Jul 2019 11:09:44 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:20 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:15 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:32:08 CET markus.moritz
03. Jan 2019 00:11:54 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.