RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027425 - Archived data from Fri, 12. January 2018 13:11:53 CET


This is all the information about APD 2419027425. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027425
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 3.5E-9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:14:09 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:53 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:05 CET jreher Updated box and position via API.
03. Feb 2021 18:17:12 CET jreher Updated box and position via API.
11. Aug 2020 17:23:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:56 CET jreher Updated APD location via API.
25. Nov 2019 17:12:52 CET jreher Updated box and position via API.
04. Jul 2019 11:09:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:18 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:13 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:34:46 CET markus.moritz
03. Jan 2019 00:11:54 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.