RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027423 - Archived data from Tue, 11. August 2020 17:23:50 CEST


This is all the information about APD 2419027423. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027423
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2509028196/2419027423
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.0495848 V     T = -25 °C: 349.1480391 V
Voltage for Gain 150: T = +20 °C: 392.8991796 V     T = -25 °C: 356.6310228 V
Voltage for Gain 200: T = +20 °C: 397.2564021 V     T = -25 °C: 360.8269537 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.821933779 V-1     T = -25 °C: 4.540960278 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.99965598 V-1     T = -25 °C: 9.528297949 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33284296 V-1     T = -25 °C: 15.42103133 V-1
Break-through voltage: T = +20 °C: 412.3036855 V     T = -25 °C: 376.2525353 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:05 CET jreher Updated box and position via API.
03. Feb 2021 18:17:12 CET jreher Updated box and position via API.
11. Aug 2020 17:23:50 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:07 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:47 CET jreher Updated box and position via API.
27. Nov 2019 19:33:55 CET jreher Updated APD location via API.
25. Nov 2019 17:12:52 CET jreher Updated box and position via API.
04. Jul 2019 11:09:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:18 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:12 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:38:10 CET markus.moritz
03. Jan 2019 00:11:54 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.