RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027418 - Archived data from Tue, 11. August 2020 17:23:49 CEST


This is all the information about APD 2419027418. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027418
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 385.6 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.4055554 V     T = -25 °C: 349.3739209 V
Voltage for Gain 150: T = +20 °C: 393.2468869 V     T = -25 °C: 356.7786528 V
Voltage for Gain 200: T = +20 °C: 397.6171809 V     T = -25 °C: 361.0031933 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.447582511 V-1     T = -25 °C: 4.725521996 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.311685425 V-1     T = -25 °C: 9.882726893 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.14242185 V-1     T = -25 °C: 14.29054874 V-1
Break-through voltage: T = +20 °C: 411.8164345 V     T = -25 °C: 375.9644308 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:04 CET jreher Updated box and position via API.
03. Feb 2021 18:17:11 CET jreher Updated box and position via API.
08. Dec 2020 17:09:32 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:55 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:38 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:12 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:51:38 CET markus.moritz
03. Jan 2019 00:11:54 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.