Subdetector specification:  
Serial: 2419027412
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 375.9 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.2432062 V     T = -25 °C: 340.9997421 V
Voltage for Gain 150: T = +20 °C: 383.9600604 V     T = -25 °C: 348.2908436 V
Voltage for Gain 200: T = +20 °C: 388.2691493 V     T = -25 °C: 352.3766169 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.671193484 V-1     T = -25 °C: 4.918568343 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.211137713 V-1     T = -25 °C: 9.379742917 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52408881 V-1     T = -25 °C: 15.15536944 V-1
Break-through voltage: T = +20 °C: 404.0499908 V     T = -25 °C: 367.9210095 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:03 CET jreher Updated box and position via API.
03. Feb 2021 18:17:11 CET jreher Updated box and position via API.
11. Aug 2020 17:23:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:55 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:12 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 12:51:38 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.