RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027406 - Archived data from Wed, 03. February 2021 18:17:10 CET


This is all the information about APD 2419027406. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027406
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2707030550/2419027406
Unit: #1171 (barcode 1309012909)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.6 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6825377 V     T = -25 °C: 343.3598078 V
Voltage for Gain 150: T = +20 °C: 386.4859031 V     T = -25 °C: 350.7200724 V
Voltage for Gain 200: T = +20 °C: 390.8799159 V     T = -25 °C: 354.8334116 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.514618576 V-1     T = -25 °C: 5.004292491 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.981222962 V-1     T = -25 °C: 9.838997859 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.22214556 V-1     T = -25 °C: 15.60602481 V-1
Break-through voltage: T = +20 °C: 406.5512379 V     T = -25 °C: 370.2960029 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:03 CET jreher Updated box and position via API.
03. Feb 2021 18:17:10 CET jreher Updated box and position via API.
11. Aug 2020 17:23:47 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:54 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:24 CET jreher Updated box and position via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:51 CET jreher Updated box and position via API.
04. Jul 2019 11:09:37 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:17 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:11 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:09:38 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.