RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027400 - Archived data from Wed, 03. February 2021 18:17:09 CET


This is all the information about APD 2419027400. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027400
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2308024771/2419027400
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 2.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 25
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6716415 V     T = -25 °C: 342.5796742 V
Voltage for Gain 150: T = +20 °C: 385.4461457 V     T = -25 °C: 349.913851 V
Voltage for Gain 200: T = +20 °C: 389.7936287 V     T = -25 °C: 354.0210708 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.768233268 V-1     T = -25 °C: 5.042090775 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.097094239 V-1     T = -25 °C: 9.968525611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52210904 V-1     T = -25 °C: 16.39709382 V-1
Break-through voltage: T = +20 °C: 404.9541582 V     T = -25 °C: 368.6300903 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:02 CET jreher Updated box and position via API.
03. Feb 2021 18:17:09 CET jreher Updated box and position via API.
11. Aug 2020 17:23:45 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:26 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:19 CET jreher Updated box and position via API.
27. Nov 2019 19:33:54 CET jreher Updated APD location via API.
25. Nov 2019 17:12:50 CET jreher Updated box and position via API.
04. Jul 2019 11:09:36 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:16 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:10 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:08:02 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:53 CET Tobias Imported from Hamamatsu datasheet.