RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2419027396 - Archived data from Tue, 11. August 2020 17:23:45 CEST


This is all the information about APD 2419027396. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2419027396
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 2.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1587387 V     T = -25 °C: 344.9028889 V
Voltage for Gain 150: T = +20 °C: 388.0375779 V     T = -25 °C: 352.3473402 V
Voltage for Gain 200: T = +20 °C: 392.4452148 V     T = -25 °C: 356.540956 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608083923 V-1     T = -25 °C: 4.901715474 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.633444675 V-1     T = -25 °C: 9.556384303 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.50118399 V-1     T = -25 °C: 15.41276064 V-1
Break-through voltage: T = +20 °C: 405.8773456 V     T = -25 °C: 371.5015977 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:01 CET jreher Updated box and position via API.
03. Feb 2021 18:17:09 CET jreher Updated box and position via API.
11. Aug 2020 17:23:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:53 CET jreher Updated APD location via API.
25. Nov 2019 17:12:50 CET jreher Updated box and position via API.
04. Jul 2019 11:09:36 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:10 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:16:55 CET markus.moritz
03. Jan 2019 00:11:53 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.