RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027369 - Archived data from Fri, 05. February 2021 10:51:00 CET


This is all the information about APD 2418027369. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027369
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.5 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 25
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.1522732 V     T = -25 °C: 341.1777496 V
Voltage for Gain 150: T = +20 °C: 383.9730623 V     T = -25 °C: 348.5178012 V
Voltage for Gain 200: T = +20 °C: 388.3392221 V     T = -25 °C: 352.6481173 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.512695635 V-1     T = -25 °C: 4.750959355 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.339254342 V-1     T = -25 °C: 9.154151987 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91044067 V-1     T = -25 °C: 14.67443408 V-1
Break-through voltage: T = +20 °C: 403.1841221 V     T = -25 °C: 366.8969219 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:09:39 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:30 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:00 CET jreher Updated box and position via API.
03. Feb 2021 18:17:07 CET jreher Updated box and position via API.
11. Aug 2020 17:23:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:53 CET jreher Updated APD location via API.
25. Nov 2019 17:12:49 CET jreher Updated box and position via API.
04. Jul 2019 11:09:35 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:09 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 13:02:00 CET markus.moritz
03. Jan 2019 00:11:52 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.