Show Hamamatsu Avalanche Photo Diode 2418027367 - Archived data from Thu, 03. January 2019 00:11:52 CET
This is all the information about APD 2418027367. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2418027367 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E05 |
Break-through voltage: | 403 V |
Voltage for Gain 100 (T=+25°C): | 374.8 V |
Dark current: | 3.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 25 |
Position in Box: | 1 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:51:00 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:17:07 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:23:43 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:33:53 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:49 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:09:35 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:47:15 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:32:09 CEST | jreher | Updated APD batch assignment via API. |
28. Jan 2019 13:14:36 CET | markus.moritz | |
03. Jan 2019 00:11:52 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:52 CET | Tobias | Imported from Hamamatsu datasheet. |