RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027364 - Archived data from Tue, 11. August 2020 17:23:42 CEST


This is all the information about APD 2418027364. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027364
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 24
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2898918 V     T = -25 °C: 344.9858152 V
Voltage for Gain 150: T = +20 °C: 388.204964 V     T = -25 °C: 352.4306915 V
Voltage for Gain 200: T = +20 °C: 392.6347766 V     T = -25 °C: 356.6181235 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.571648251 V-1     T = -25 °C: 4.891852035 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.501565925 V-1     T = -25 °C: 9.514831231 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14289148 V-1     T = -25 °C: 15.41959745 V-1
Break-through voltage: T = +20 °C: 408.5301855 V     T = -25 °C: 371.9427947 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:58 CET jreher Updated box and position via API.
03. Feb 2021 18:17:05 CET jreher Updated box and position via API.
11. Aug 2020 17:23:42 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:45 CET jreher Updated APD location via API.
25. Nov 2019 17:12:48 CET jreher Updated box and position via API.
04. Jul 2019 11:09:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:14 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:09 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:07:34 CET markus.moritz
03. Jan 2019 00:11:52 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.