RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027346 - Archived data from Thu, 15. April 2021 16:57:56 CEST


This is all the information about APD 2418027346. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027346
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 24
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.4981343 V     T = -25 °C: 346.0946362 V
Voltage for Gain 150: T = +20 °C: 389.3567581 V     T = -25 °C: 353.4428168 V
Voltage for Gain 200: T = +20 °C: 393.6381672 V     T = -25 °C: 357.6108899 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429910333 V-1     T = -25 °C: 4.891363948 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.35451547 V-1     T = -25 °C: 9.740666263 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89343548 V-1     T = -25 °C: 15.61684374 V-1
Break-through voltage: T = +20 °C: 408.671048 V     T = -25 °C: 372.5709017 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:05 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:56 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:56 CET jreher Updated box and position via API.
03. Feb 2021 18:17:03 CET jreher Updated box and position via API.
11. Aug 2020 17:23:39 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:44 CET jreher Updated APD location via API.
25. Nov 2019 17:12:47 CET jreher Updated box and position via API.
04. Jul 2019 11:09:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:13 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:28 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:36:43 CET markus.moritz
03. Jan 2019 00:11:51 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.