RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027339 - Archived data from Wed, 03. February 2021 18:17:02 CET


This is all the information about APD 2418027339. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027339
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2418027339/2413026968
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 24
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6544336 V     T = -25 °C: 348.027347 V
Voltage for Gain 150: T = +20 °C: 391.5177325 V     T = -25 °C: 355.4627469 V
Voltage for Gain 200: T = +20 °C: 395.8491488 V     T = -25 °C: 359.609434 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.670339141 V-1     T = -25 °C: 4.846572309 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.710965323 V-1     T = -25 °C: 9.442867529 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.33943063 V-1     T = -25 °C: 15.82260514 V-1
Break-through voltage: T = +20 °C: 410.654758 V     T = -25 °C: 374.6093316 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:55 CET jreher Updated box and position via API.
03. Feb 2021 18:17:02 CET jreher Updated box and position via API.
11. Aug 2020 17:23:37 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:14:28 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:42 CET jreher Updated box and position via API.
27. Nov 2019 19:33:43 CET jreher Updated APD location via API.
25. Nov 2019 17:12:46 CET jreher Updated box and position via API.
04. Jul 2019 11:09:28 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:27 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:48:56 CET markus.moritz
03. Jan 2019 00:11:51 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.