RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027337 - Archived data from Tue, 11. August 2020 17:23:37 CEST


This is all the information about APD 2418027337. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027337
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.5 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 24
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.7612622 V     T = -25 °C: 339.8863819 V
Voltage for Gain 150: T = +20 °C: 382.472988 V     T = -25 °C: 347.1435572 V
Voltage for Gain 200: T = +20 °C: 386.7941255 V     T = -25 °C: 351.2116267 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.721678336 V-1     T = -25 °C: 4.910818649 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.203220094 V-1     T = -25 °C: 9.770039514 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55517106 V-1     T = -25 °C: 15.00293283 V-1
Break-through voltage: T = +20 °C: 402.3483909 V     T = -25 °C: 366.5366901 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:54 CET jreher Updated box and position via API.
03. Feb 2021 18:17:02 CET jreher Updated box and position via API.
11. Aug 2020 17:23:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:43 CET jreher Updated APD location via API.
25. Nov 2019 17:12:46 CET jreher Updated box and position via API.
04. Jul 2019 11:09:28 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:27 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:51:48 CET markus.moritz
03. Jan 2019 00:11:51 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.