RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027336 - Archived data from Tue, 11. August 2020 17:23:37 CEST


This is all the information about APD 2418027336. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027336
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 24
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5222558 V     T = -25 °C: 344.0786943 V
Voltage for Gain 150: T = +20 °C: 387.2977336 V     T = -25 °C: 351.4494099 V
Voltage for Gain 200: T = +20 °C: 391.6416097 V     T = -25 °C: 355.5652739 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.465821093 V-1     T = -25 °C: 4.661682416 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.69605056 V-1     T = -25 °C: 9.224497361 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.69103614 V-1     T = -25 °C: 15.81191002 V-1
Break-through voltage: T = +20 °C: 404.9438482 V     T = -25 °C: 369.2692514 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:54 CET jreher Updated box and position via API.
03. Feb 2021 18:17:02 CET jreher Updated box and position via API.
11. Aug 2020 17:23:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:43 CET jreher Updated APD location via API.
25. Nov 2019 17:12:46 CET jreher Updated box and position via API.
04. Jul 2019 11:09:28 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:12 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:07 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:27 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:53:02 CET markus.moritz
03. Jan 2019 00:11:51 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.