RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027324 - Archived data from Tue, 11. August 2020 17:23:35 CEST


This is all the information about APD 2418027324. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027324
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 24
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5585869 V     T = -25 °C: 341.476537 V
Voltage for Gain 150: T = +20 °C: 384.3589749 V     T = -25 °C: 348.7809826 V
Voltage for Gain 200: T = +20 °C: 388.65474 V     T = -25 °C: 352.8762953 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.438069513 V-1     T = -25 °C: 4.920455039 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.239560185 V-1     T = -25 °C: 9.680014409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95783082 V-1     T = -25 °C: 15.52438054 V-1
Break-through voltage: T = +20 °C: 404.1949751 V     T = -25 °C: 368.057133 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:53 CET jreher Updated box and position via API.
03. Feb 2021 18:17:01 CET jreher Updated box and position via API.
11. Aug 2020 17:23:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:42 CET jreher Updated APD location via API.
25. Nov 2019 17:12:45 CET jreher Updated box and position via API.
04. Jul 2019 11:09:27 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:11 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:26 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 13:46:04 CET markus.moritz
03. Jan 2019 00:11:51 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:52 CET Tobias Imported from Hamamatsu datasheet.