RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2418027313 - Archived data from Wed, 03. February 2021 18:16:57 CET


This is all the information about APD 2418027313. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2418027313
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2418027313/2705030378
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 23
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.18296 V     T = -25 °C: 342.9452156 V
Voltage for Gain 150: T = +20 °C: 386.0072982 V     T = -25 °C: 350.2998632 V
Voltage for Gain 200: T = +20 °C: 390.3735336 V     T = -25 °C: 354.4293312 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466634508 V-1     T = -25 °C: 4.860689728 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.581664798 V-1     T = -25 °C: 9.736025764 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50062545 V-1     T = -25 °C: 15.14495136 V-1
Break-through voltage: T = +20 °C: 405.8240629 V     T = -25 °C: 369.7062987 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:49 CET jreher Updated box and position via API.
03. Feb 2021 18:16:57 CET jreher Updated box and position via API.
08. Dec 2020 17:07:01 CET jreher Assigned to capsule by script
17. Aug 2020 16:01:01 CEST vwerner Updated box and position via API.
11. Aug 2020 17:23:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:34 CET jreher Updated APD location via API.
25. Nov 2019 17:12:43 CET jreher Updated box and position via API.
04. Jul 2019 11:09:22 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:09 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:14 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:32:22 CET markus.moritz
03. Jan 2019 00:11:50 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.