RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027274 - Archived data from Wed, 03. February 2021 18:16:53 CET


This is all the information about APD 2417027274. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027274
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2520029120/2417027274
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 23
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.591325 V     T = -25 °C: 342.4260204 V
Voltage for Gain 150: T = +20 °C: 385.3773824 V     T = -25 °C: 349.7419885 V
Voltage for Gain 200: T = +20 °C: 389.734291 V     T = -25 °C: 353.8614193 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.935263473 V-1     T = -25 °C: 5.001573982 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.6114127 V-1     T = -25 °C: 9.793253964 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05785123 V-1     T = -25 °C: 14.83713368 V-1
Break-through voltage: T = +20 °C: 405.6669526 V     T = -25 °C: 369.3721779 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:45 CET jreher Updated box and position via API.
03. Feb 2021 18:16:53 CET jreher Updated box and position via API.
08. Dec 2020 17:17:23 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:02 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:31 CET jreher Updated APD location via API.
25. Nov 2019 17:12:41 CET jreher Updated box and position via API.
04. Jul 2019 11:09:19 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:06 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:26:31 CET markus.moritz
03. Jan 2019 00:11:49 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.