RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027270 - Archived data from Wed, 07. October 2020 12:18:38 CEST


This is all the information about APD 2417027270. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027270
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025938/2417027270
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 23
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2689366 V     T = -25 °C: 345.762518 V
Voltage for Gain 150: T = +20 °C: 389.1002572 V     T = -25 °C: 353.2374762 V
Voltage for Gain 200: T = +20 °C: 393.4644627 V     T = -25 °C: 357.4112631 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.464490509 V-1     T = -25 °C: 4.945897726 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.082418145 V-1     T = -25 °C: 9.182257818 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30828686 V-1     T = -25 °C: 16.47922195 V-1
Break-through voltage: T = +20 °C: 405.2603003 V     T = -25 °C: 372.838419 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:45 CET jreher Updated box and position via API.
03. Feb 2021 18:16:53 CET jreher Updated box and position via API.
07. Oct 2020 12:18:38 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:58 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:25 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:31 CET jreher Updated APD location via API.
25. Nov 2019 17:12:40 CET jreher Updated box and position via API.
04. Jul 2019 11:09:19 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:06 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:32:49 CET markus.moritz
03. Jan 2019 00:11:49 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.