RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027269 - Archived data from Fri, 05. February 2021 10:50:45 CET


This is all the information about APD 2417027269. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027269
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 23
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.071967 V     T = -25 °C: 345.3071283 V
Voltage for Gain 150: T = +20 °C: 388.8352238 V     T = -25 °C: 352.7603872 V
Voltage for Gain 200: T = +20 °C: 393.1921734 V     T = -25 °C: 356.912464 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.550659454 V-1     T = -25 °C: 4.66364771 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.951343905 V-1     T = -25 °C: 9.499018939 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 16.23696462 V-1     T = -25 °C: 14.76321886 V-1
Break-through voltage: T = +20 °C: 408.3416315 V     T = -25 °C: 372.1808791 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:27:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:45 CET jreher Updated box and position via API.
03. Feb 2021 18:16:53 CET jreher Updated box and position via API.
11. Aug 2020 17:23:25 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:31 CET jreher Updated APD location via API.
25. Nov 2019 17:12:40 CET jreher Updated box and position via API.
04. Jul 2019 11:09:19 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:06 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:12:06 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:33:48 CET markus.moritz
03. Jan 2019 00:11:49 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:51 CET Tobias Imported from Hamamatsu datasheet.