RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027255 - Archived data from Tue, 11. August 2020 17:23:22 CEST


This is all the information about APD 2417027255. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027255
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.6673113 V     T = -25 °C: 341.6836233 V
Voltage for Gain 150: T = +20 °C: 384.4284798 V     T = -25 °C: 349.0038355 V
Voltage for Gain 200: T = +20 °C: 388.7762662 V     T = -25 °C: 353.1011834 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646340515 V-1     T = -25 °C: 4.927902697 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.025180103 V-1     T = -25 °C: 9.987213082 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39988463 V-1     T = -25 °C: 15.5698898 V-1
Break-through voltage: T = +20 °C: 404.0089078 V     T = -25 °C: 368.2111146 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:55 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:41 CET jreher Updated box and position via API.
03. Feb 2021 18:16:49 CET jreher Updated box and position via API.
11. Aug 2020 17:23:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:22 CET jreher Updated APD location via API.
25. Nov 2019 17:12:38 CET jreher Updated box and position via API.
04. Jul 2019 11:09:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:05 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:56 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:47:24 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.