RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027253 - Archived data from Tue, 11. August 2020 17:23:21 CEST


This is all the information about APD 2417027253. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027253
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.3 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.5624049 V     T = -25 °C: 340.6873459 V
Voltage for Gain 150: T = +20 °C: 383.3082405 V     T = -25 °C: 348.0044385 V
Voltage for Gain 200: T = +20 °C: 387.6522215 V     T = -25 °C: 352.0993297 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.7110742 V-1     T = -25 °C: 4.947306127 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.100440481 V-1     T = -25 °C: 9.965416199 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56977687 V-1     T = -25 °C: 15.50775769 V-1
Break-through voltage: T = +20 °C: 403.1175426 V     T = -25 °C: 367.3779985 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:55 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:40 CET jreher Updated box and position via API.
03. Feb 2021 18:16:49 CET jreher Updated box and position via API.
11. Aug 2020 17:23:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:22 CET jreher Updated APD location via API.
25. Nov 2019 17:12:38 CET jreher Updated box and position via API.
04. Jul 2019 11:09:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:56 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:50:32 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.