RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2417027252 - Archived data from Tue, 11. August 2020 17:23:21 CEST


This is all the information about APD 2417027252. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2417027252
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2022843 V     T = -25 °C: 344.0314119 V
Voltage for Gain 150: T = +20 °C: 387.0055813 V     T = -25 °C: 351.4120288 V
Voltage for Gain 200: T = +20 °C: 391.3522645 V     T = -25 °C: 355.5778437 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.437452362 V-1     T = -25 °C: 4.762630961 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.282802993 V-1     T = -25 °C: 9.389458355 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16339324 V-1     T = -25 °C: 16.20649198 V-1
Break-through voltage: T = +20 °C: 406.2108378 V     T = -25 °C: 370.5117293 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:40 CET jreher Updated box and position via API.
03. Feb 2021 18:16:49 CET jreher Updated box and position via API.
25. Jan 2021 14:45:06 CET jreher Assigned to capsule by script
17. Aug 2020 15:50:58 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:21 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:20 CET jreher Updated box and position via API.
27. Nov 2019 19:33:22 CET jreher Updated APD location via API.
25. Nov 2019 17:12:38 CET jreher Updated box and position via API.
04. Jul 2019 11:09:13 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:56 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:51:54 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.