RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027224 - Archived data from Wed, 03. February 2021 18:16:48 CET


This is all the information about APD 2416027224. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027224
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2511028357/2416027224
Unit: #1430 (barcode 1309015658)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 22
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6669409 V     T = -25 °C: 345.2551257 V
Voltage for Gain 150: T = +20 °C: 388.5024818 V     T = -25 °C: 352.6809335 V
Voltage for Gain 200: T = +20 °C: 392.8700231 V     T = -25 °C: 356.857521 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.603272464 V-1     T = -25 °C: 4.677423778 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.843915382 V-1     T = -25 °C: 9.110107752 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.98825847 V-1     T = -25 °C: 15.64254798 V-1
Break-through voltage: T = +20 °C: 407.4466658 V     T = -25 °C: 371.8328663 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:39 CET jreher Updated box and position via API.
03. Feb 2021 18:16:48 CET jreher Updated box and position via API.
07. Oct 2020 12:18:34 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:59 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:21 CET jreher Updated APD location via API.
25. Nov 2019 17:12:38 CET jreher Updated box and position via API.
04. Jul 2019 11:09:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:04 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.