RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027218 - Archived data from Tue, 11. August 2020 17:23:19 CEST


This is all the information about APD 2416027218. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027218
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.3872576 V     T = -25 °C: 350.5268519 V
Voltage for Gain 150: T = +20 °C: 394.2085578 V     T = -25 °C: 358.032242 V
Voltage for Gain 200: T = +20 °C: 398.554978 V     T = -25 °C: 362.2268541 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.710726603 V-1     T = -25 °C: 4.89016911 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.229166861 V-1     T = -25 °C: 9.731858609 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16749347 V-1     T = -25 °C: 15.11300681 V-1
Break-through voltage: T = +20 °C: 412.7048738 V     T = -25 °C: 376.7517571 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:38 CET jreher Updated box and position via API.
03. Feb 2021 18:16:47 CET jreher Updated box and position via API.
07. Oct 2020 12:16:02 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:04 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:21 CET jreher Updated APD location via API.
25. Nov 2019 17:12:37 CET jreher Updated box and position via API.
04. Jul 2019 11:09:12 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:03 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:11:55 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:12:12 CET markus.moritz
03. Jan 2019 00:11:48 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.