RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027194 - Archived data from Thu, 15. April 2021 16:57:55 CEST


This is all the information about APD 2416027194. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027194
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2069483 V     T = -25 °C: 345.8637096 V
Voltage for Gain 150: T = +20 °C: 389.129384 V     T = -25 °C: 353.2913178 V
Voltage for Gain 200: T = +20 °C: 393.5607593 V     T = -25 °C: 357.5289072 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.835246354 V-1     T = -25 °C: 4.950700298 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.199686724 V-1     T = -25 °C: 9.764360432 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9460508 V-1     T = -25 °C: 16.75204855 V-1
Break-through voltage: T = +20 °C: 409.725186 V     T = -25 °C: 373.3229068 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:25:11 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:55 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:36 CET jreher Updated box and position via API.
03. Feb 2021 18:16:44 CET jreher Updated box and position via API.
11. Aug 2020 17:23:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:19 CET jreher Updated APD location via API.
25. Nov 2019 17:12:35 CET jreher Updated box and position via API.
04. Jul 2019 11:09:10 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:30 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:48:00 CET markus.moritz
03. Jan 2019 00:11:47 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:50 CET Tobias Imported from Hamamatsu datasheet.