Show Hamamatsu Avalanche Photo Diode 2416027191 - Archived data from Tue, 11. August 2020 17:23:14 CEST
This is all the information about APD 2416027191. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2416027191 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C03 |
Break-through voltage: | 409 V |
Voltage for Gain 100 (T=+25°C): | 380.4 V |
Dark current: | 6.2 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 21 |
Position in Box: | 49 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jan 2019 |
Sent for analysis after irradiation: | 25. Jan 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 21. Jan 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 22. Jan 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 380.4913124 V T = -25 °C: 345.1926707 V |
Voltage for Gain 150: | T = +20 °C: 388.4031358 V T = -25 °C: 352.6746673 V |
Voltage for Gain 200: | T = +20 °C: 392.769676 V T = -25 °C: 356.8344029 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.408541632 V-1 T = -25 °C: 4.639036241 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.487372011 V-1 T = -25 °C: 10.0172137 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.11182224 V-1 T = -25 °C: 15.73780498 V-1 |
Break-through voltage: | T = +20 °C: 408.7809206 V T = -25 °C: 372.4616998 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 10:50:33 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:16:42 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:23:14 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:33:12 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:12:34 CET | jreher | Updated box and position via API. |
04. Jul 2019 11:09:06 CEST | jreher | Updated APD location via API. |
12. Jun 2019 16:47:01 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 16:31:56 CEST | jreher | Updated APD batch assignment via API. |
12. Jun 2019 15:10:30 CEST | jreher | Updated APD batch assignment via API. |
25. Jan 2019 12:03:49 CET | markus.moritz | |
03. Jan 2019 00:11:47 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:11:49 CET | Tobias | Imported from Hamamatsu datasheet. |