RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027189 - Archived data from Wed, 03. February 2021 18:16:41 CET


This is all the information about APD 2416027189. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027189
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7019633 V     T = -25 °C: 346.6473103 V
Voltage for Gain 150: T = +20 °C: 389.5873349 V     T = -25 °C: 354.0945939 V
Voltage for Gain 200: T = +20 °C: 394.0330846 V     T = -25 °C: 358.2793461 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.676951638 V-1     T = -25 °C: 4.839879397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.616974376 V-1     T = -25 °C: 8.86757686 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.7111306 V-1     T = -25 °C: 14.43095644 V-1
Break-through voltage: T = +20 °C: 409.0688718 V     T = -25 °C: 372.9161253 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:33 CET jreher Updated box and position via API.
03. Feb 2021 18:16:41 CET jreher Updated box and position via API.
11. Aug 2020 17:23:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:12 CET jreher Updated APD location via API.
25. Nov 2019 17:12:34 CET jreher Updated box and position via API.
04. Jul 2019 11:09:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:30 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:07:14 CET markus.moritz
03. Jan 2019 00:11:47 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.