RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027185 - Archived data from Wed, 03. February 2021 18:16:41 CET


This is all the information about APD 2416027185. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027185
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.947003 V     T = -25 °C: 346.2650747 V
Voltage for Gain 150: T = +20 °C: 389.7926176 V     T = -25 °C: 353.6819967 V
Voltage for Gain 200: T = +20 °C: 394.1348497 V     T = -25 °C: 357.8501229 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660504029 V-1     T = -25 °C: 4.963696753 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.242154551 V-1     T = -25 °C: 9.718527859 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27591445 V-1     T = -25 °C: 15.55747177 V-1
Break-through voltage: T = +20 °C: 409.715098 V     T = -25 °C: 373.2308412 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:33 CET jreher Updated box and position via API.
03. Feb 2021 18:16:41 CET jreher Updated box and position via API.
11. Aug 2020 17:23:12 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:11 CET jreher Updated APD location via API.
25. Nov 2019 17:12:34 CET jreher Updated box and position via API.
04. Jul 2019 11:09:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:29 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:13:22 CET markus.moritz
03. Jan 2019 00:11:47 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.