RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027178 - Archived data from Wed, 16. June 2021 16:02:40 CEST


This is all the information about APD 2416027178. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027178
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5292847 V     T = -25 °C: 344.3227966 V
Voltage for Gain 150: T = +20 °C: 387.4399084 V     T = -25 °C: 351.7435785 V
Voltage for Gain 200: T = +20 °C: 391.8119418 V     T = -25 °C: 355.9094205 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.421067078 V-1     T = -25 °C: 4.766731913 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.260590376 V-1     T = -25 °C: 9.652249469 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36068329 V-1     T = -25 °C: 15.30246758 V-1
Break-through voltage: T = +20 °C: 407.5056215 V     T = -25 °C: 371.307856 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:41:52 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:40 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:57 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:32 CET jreher Updated box and position via API.
03. Feb 2021 18:16:40 CET jreher Updated box and position via API.
11. Aug 2020 17:23:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:11 CET jreher Updated APD location via API.
25. Nov 2019 17:12:33 CET jreher Updated box and position via API.
04. Jul 2019 11:09:05 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:00 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:29 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 13:01:27 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.