RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027168 - Archived data from Wed, 03. February 2021 18:16:39 CET


This is all the information about APD 2416027168. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027168
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8320142 V     T = -25 °C: 343.7329048 V
Voltage for Gain 150: T = +20 °C: 386.6552265 V     T = -25 °C: 351.1427655 V
Voltage for Gain 200: T = +20 °C: 391.0175366 V     T = -25 °C: 355.2964966 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.571778201 V-1     T = -25 °C: 4.874138954 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.764888857 V-1     T = -25 °C: 9.72105379 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.88388576 V-1     T = -25 °C: 15.04693017 V-1
Break-through voltage: T = +20 °C: 405.4578557 V     T = -25 °C: 370.1606475 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:31 CET jreher Updated box and position via API.
03. Feb 2021 18:16:39 CET jreher Updated box and position via API.
11. Aug 2020 17:23:09 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:10 CET jreher Updated APD location via API.
25. Nov 2019 17:12:32 CET jreher Updated box and position via API.
04. Jul 2019 11:09:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:59 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:20 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 14:01:26 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.