RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2416027164 - Archived data from Wed, 03. February 2021 18:16:39 CET


This is all the information about APD 2416027164. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2416027164
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3038712 V     T = -25 °C: 344.8845411 V
Voltage for Gain 150: T = +20 °C: 388.1219835 V     T = -25 °C: 352.2866983 V
Voltage for Gain 200: T = +20 °C: 392.496299 V     T = -25 °C: 356.453683 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70501711 V-1     T = -25 °C: 4.784878878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163665743 V-1     T = -25 °C: 9.467469743 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83334885 V-1     T = -25 °C: 14.55897639 V-1
Break-through voltage: T = +20 °C: 407.1060015 V     T = -25 °C: 370.7805189 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:22:03 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:27 CET jreher Updated box and position via API.
05. Feb 2021 10:50:31 CET jreher Updated box and position via API.
03. Feb 2021 18:16:39 CET jreher Updated box and position via API.
11. Aug 2020 17:23:08 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:10 CET jreher Updated APD location via API.
25. Nov 2019 17:12:32 CET jreher Updated box and position via API.
04. Jul 2019 11:09:04 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:20 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:23:02 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.