RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027155 - Archived data from Wed, 03. February 2021 18:16:38 CET


This is all the information about APD 2415027155. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027155
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1502016633/2415027155
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 21
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9950835 V     T = -25 °C: 344.0166596 V
Voltage for Gain 150: T = +20 °C: 386.7740233 V     T = -25 °C: 351.3923165 V
Voltage for Gain 200: T = +20 °C: 391.1168256 V     T = -25 °C: 355.5155631 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.608858484 V-1     T = -25 °C: 4.865506557 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.973030703 V-1     T = -25 °C: 9.83006313 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56796105 V-1     T = -25 °C: 15.4488479 V-1
Break-through voltage: T = +20 °C: 406.076643 V     T = -25 °C: 370.4231608 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:30 CET jreher Updated box and position via API.
03. Feb 2021 18:16:38 CET jreher Updated box and position via API.
11. Aug 2020 17:23:07 CEST jreher Updated APD characteristics via API.
27. Mar 2020 11:32:42 CET jreher Assigned to capsule by script
13. Feb 2020 15:25:40 CET jreher Updated box and position via API.
27. Nov 2019 19:33:09 CET jreher Updated APD location via API.
25. Nov 2019 17:12:32 CET jreher Updated box and position via API.
04. Jul 2019 11:09:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:19 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:33:09 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.