RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027150 - Archived data from Tue, 11. August 2020 17:23:06 CEST


This is all the information about APD 2415027150. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027150
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5263514 V     T = -25 °C: 341.4051958 V
Voltage for Gain 150: T = +20 °C: 384.2960491 V     T = -25 °C: 348.7454902 V
Voltage for Gain 200: T = +20 °C: 388.6499627 V     T = -25 °C: 352.8650883 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.672353663 V-1     T = -25 °C: 5.017158856 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.055345755 V-1     T = -25 °C: 9.190389097 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39713724 V-1     T = -25 °C: 15.89983545 V-1
Break-through voltage: T = +20 °C: 403.6292539 V     T = -25 °C: 367.445146 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:29 CET jreher Updated box and position via API.
03. Feb 2021 18:16:37 CET jreher Updated box and position via API.
11. Aug 2020 17:23:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:09 CET jreher Updated APD location via API.
25. Nov 2019 17:12:31 CET jreher Updated box and position via API.
04. Jul 2019 11:09:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:58 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:19 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:51:17 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.