RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027149 - Archived data from Thu, 03. January 2019 00:11:46 CET


This is all the information about APD 2415027149. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027149
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 21
Position in Box: 10
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:36:32 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:57 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:29 CET jreher Updated box and position via API.
03. Feb 2021 18:16:37 CET jreher Updated box and position via API.
11. Aug 2020 17:23:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:09 CET jreher Updated APD location via API.
25. Nov 2019 17:12:31 CET jreher Updated box and position via API.
04. Jul 2019 11:09:03 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:57 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:19 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 12:52:21 CET markus.moritz
03. Jan 2019 00:11:46 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.