RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027136 - Archived data from Mon, 17. August 2020 15:50:46 CEST


This is all the information about APD 2415027136. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027136
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.9778299 V     T = -25 °C: 341.9367048 V
Voltage for Gain 150: T = +20 °C: 384.6839288 V     T = -25 °C: 349.2898636 V
Voltage for Gain 200: T = +20 °C: 389.0814277 V     T = -25 °C: 353.4224681 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.428536733 V-1     T = -25 °C: 4.275431018 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.209139919 V-1     T = -25 °C: 9.854746324 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.39180593 V-1     T = -25 °C: 16.45029011 V-1
Break-through voltage: T = +20 °C: 404.5365044 V     T = -25 °C: 368.560542 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:25 CET jreher Updated box and position via API.
03. Feb 2021 18:16:34 CET jreher Updated box and position via API.
07. Oct 2020 12:17:35 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:23:04 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:12 CET jreher Updated box and position via API.
27. Nov 2019 19:33:01 CET jreher Updated APD location via API.
25. Nov 2019 17:12:29 CET jreher Updated box and position via API.
04. Jul 2019 11:08:57 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:51 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:11 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:55:50 CET markus.moritz
25. Jan 2019 10:53:55 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:49 CET Tobias Imported from Hamamatsu datasheet.