RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027126 - Archived data from Fri, 05. February 2021 10:50:24 CET


This is all the information about APD 2415027126. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027126
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2529787 V     T = -25 °C: 342.0628538 V
Voltage for Gain 150: T = +20 °C: 385.0442405 V     T = -25 °C: 349.3892518 V
Voltage for Gain 200: T = +20 °C: 389.3671831 V     T = -25 °C: 353.499723 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.439442299 V-1     T = -25 °C: 5.057962245 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.942607033 V-1     T = -25 °C: 9.247489261 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57355175 V-1     T = -25 °C: 16.28938275 V-1
Break-through voltage: T = +20 °C: 405.308669 V     T = -25 °C: 369.0350766 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:09:58 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:39 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:24 CET jreher Updated box and position via API.
03. Feb 2021 18:16:33 CET jreher Updated box and position via API.
11. Aug 2020 17:23:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:33:00 CET jreher Updated APD location via API.
25. Nov 2019 17:12:29 CET jreher Updated box and position via API.
04. Jul 2019 11:08:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:10 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:18:02 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.