RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027124 - Archived data from Wed, 03. February 2021 18:16:33 CET


This is all the information about APD 2415027124. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027124
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027124/2314025308
Unit: #979 (barcode 1309010554)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7972944 V     T = -25 °C: 344.4581962 V
Voltage for Gain 150: T = +20 °C: 387.5704774 V     T = -25 °C: 351.7968622 V
Voltage for Gain 200: T = +20 °C: 391.9312235 V     T = -25 °C: 355.9040034 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.661211388 V-1     T = -25 °C: 4.712771413 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.237990944 V-1     T = -25 °C: 9.159255608 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.66349966 V-1     T = -25 °C: 14.76558827 V-1
Break-through voltage: T = +20 °C: 407.336888 V     T = -25 °C: 371.2053924 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:24 CET jreher Updated box and position via API.
03. Feb 2021 18:16:33 CET jreher Updated box and position via API.
11. Aug 2020 17:23:01 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:30 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:11 CET jreher Updated box and position via API.
27. Nov 2019 19:33:00 CET jreher Updated APD location via API.
25. Nov 2019 17:12:29 CET jreher Updated box and position via API.
04. Jul 2019 11:08:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:10 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:13:46 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.