RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027123 - Archived data from Wed, 03. February 2021 18:16:32 CET


This is all the information about APD 2415027123. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027123
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027123/2514028610
Unit: #1061 (barcode 1309011483)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4582185 V     T = -25 °C: 342.3015059 V
Voltage for Gain 150: T = +20 °C: 385.2181903 V     T = -25 °C: 349.6187954 V
Voltage for Gain 200: T = +20 °C: 389.5135854 V     T = -25 °C: 353.7142221 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391582919 V-1     T = -25 °C: 4.909834293 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.711359179 V-1     T = -25 °C: 9.25111022 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27933134 V-1     T = -25 °C: 15.79739849 V-1
Break-through voltage: T = +20 °C: 404.9767199 V     T = -25 °C: 368.9146138 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:24 CET jreher Updated box and position via API.
03. Feb 2021 18:16:32 CET jreher Updated box and position via API.
11. Aug 2020 17:23:01 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:33 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:01 CET jreher Updated box and position via API.
27. Nov 2019 19:33:00 CET jreher Updated APD location via API.
25. Nov 2019 17:12:28 CET jreher Updated box and position via API.
04. Jul 2019 11:08:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:10 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:12:14 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.