RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027119 - Archived data from Wed, 03. February 2021 18:16:32 CET


This is all the information about APD 2415027119. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027119
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027119/1409015700
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 30
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1469104 V     T = -25 °C: 344.6973646 V
Voltage for Gain 150: T = +20 °C: 387.9426861 V     T = -25 °C: 352.0578722 V
Voltage for Gain 200: T = +20 °C: 392.2846553 V     T = -25 °C: 356.150155 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.737671489 V-1     T = -25 °C: 5.550462221 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.679173457 V-1     T = -25 °C: 9.213297335 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44991382 V-1     T = -25 °C: 14.87982346 V-1
Break-through voltage: T = +20 °C: 407.4649261 V     T = -25 °C: 371.290065 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:23 CET jreher Updated box and position via API.
03. Feb 2021 18:16:32 CET jreher Updated box and position via API.
03. Sep 2020 14:25:44 CEST jreher Assigned to capsule by script
11. Aug 2020 17:23:01 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:32 CET jreher Updated box and position via API.
27. Nov 2019 19:32:59 CET jreher Updated APD location via API.
25. Nov 2019 17:12:28 CET jreher Updated box and position via API.
04. Jul 2019 11:08:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:10 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:24:25 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.