RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027118 - Archived data from Tue, 11. August 2020 17:23:00 CEST


This is all the information about APD 2415027118. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027118
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 25. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.2944761 V     T = -25 °C: 342.0656011 V
Voltage for Gain 150: T = +20 °C: 385.0621349 V     T = -25 °C: 349.409453 V
Voltage for Gain 200: T = +20 °C: 389.3886913 V     T = -25 °C: 353.478034 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.310604552 V-1     T = -25 °C: 4.944631096 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.139267484 V-1     T = -25 °C: 9.1812992 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29248721 V-1     T = -25 °C: 16.04062775 V-1
Break-through voltage: T = +20 °C: 404.7344552 V     T = -25 °C: 368.5245889 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:10:06 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:41 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:23 CET jreher Updated box and position via API.
03. Feb 2021 18:16:32 CET jreher Updated box and position via API.
11. Aug 2020 17:23:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:59 CET jreher Updated APD location via API.
25. Nov 2019 17:12:28 CET jreher Updated box and position via API.
04. Jul 2019 11:08:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:55 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:50 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:10 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 11:25:45 CET markus.moritz
03. Jan 2019 00:11:45 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.