RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027105 - Archived data from Fri, 05. February 2021 10:50:22 CET


This is all the information about APD 2415027105. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027105
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 20
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4072108 V     T = -25 °C: 345.2083865 V
Voltage for Gain 150: T = +20 °C: 388.139139 V     T = -25 °C: 352.550955 V
Voltage for Gain 200: T = +20 °C: 392.4565382 V     T = -25 °C: 356.6809008 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.725143684 V-1     T = -25 °C: 4.731169888 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.245297535 V-1     T = -25 °C: 9.35175717 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.11040766 V-1     T = -25 °C: 16.05603073 V-1
Break-through voltage: T = +20 °C: 407.517385 V     T = -25 °C: 371.548066 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 16:34:20 CEST jreher Updated box and position via API.
05. Feb 2021 10:50:22 CET jreher Updated box and position via API.
03. Feb 2021 18:16:31 CET jreher Updated box and position via API.
11. Aug 2020 17:22:57 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:27 CET jreher Updated box and position via API.
04. Jul 2019 11:08:55 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.