RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2415027101


This is all the information about APD 2415027101. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2415027101
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027101/0718006710
Unit: #1104 (barcode 1309012404)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: 10032
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6331073 V     T = -25 °C: 347.1068523 V
Voltage for Gain 150: T = +20 °C: 390.4003413 V     T = -25 °C: 354.496653 V
Voltage for Gain 200: T = +20 °C: 394.727984 V     T = -25 °C: 358.6603522 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.638794783 V-1     T = -25 °C: 4.714155245 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.050299424 V-1     T = -25 °C: 9.344821941 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42477578 V-1     T = -25 °C: 16.18148307 V-1
Break-through voltage: T = +20 °C: 409.6009476 V     T = -25 °C: 373.5232101 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
05. Feb 2021 10:50:21 CET jreher Updated box and position via API.
03. Feb 2021 18:16:30 CET jreher Updated box and position via API.
11. Aug 2020 17:22:57 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:47:29 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:20 CET jreher Updated box and position via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.