RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027090 - Archived data from Mon, 30. August 2021 14:06:49 CEST


This is all the information about APD 2414027090. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027090
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 238
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.587132 V     T = -25 °C: 349.8425508 V
Voltage for Gain 150: T = +20 °C: 393.4437276 V     T = -25 °C: 357.338784 V
Voltage for Gain 200: T = +20 °C: 397.8278701 V     T = -25 °C: 361.5502157 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.631948744 V-1     T = -25 °C: 4.788522927 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.971161684 V-1     T = -25 °C: 9.442979447 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4014372 V-1     T = -25 °C: 14.67663239 V-1
Break-through voltage: T = +20 °C: 413.0611864 V     T = -25 °C: 376.7223145 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:08:25 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:06:49 CEST oafedulidis Updated box and position via API.
26. Apr 2021 15:22:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:50:21 CET jreher Updated box and position via API.
03. Feb 2021 18:16:30 CET jreher Updated box and position via API.
11. Aug 2020 17:22:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.