RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027087 - Archived data from Wed, 03. February 2021 18:16:29 CET


This is all the information about APD 2414027087. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027087
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2414027087/2710030771
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1854712 V     T = -25 °C: 344.6388969 V
Voltage for Gain 150: T = +20 °C: 387.9953771 V     T = -25 °C: 351.9976846 V
Voltage for Gain 200: T = +20 °C: 392.3530977 V     T = -25 °C: 356.1136185 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43310707 V-1     T = -25 °C: 4.919911627 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.285605176 V-1     T = -25 °C: 9.884426007 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1523773 V-1     T = -25 °C: 15.31037905 V-1
Break-through voltage: T = +20 °C: 407.9750231 V     T = -25 °C: 371.2676652 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:20 CET jreher Updated box and position via API.
03. Feb 2021 18:16:29 CET jreher Updated box and position via API.
11. Aug 2020 17:22:56 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:15 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:31 CET jreher Updated box and position via API.
13. Feb 2020 14:22:19 CET jreher Updated box and position via API.
27. Nov 2019 19:32:58 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:54 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:53 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.