RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027083 - Archived data from Tue, 11. August 2020 17:22:55 CEST


This is all the information about APD 2414027083. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027083
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025945/2414027083
Unit: #843 (barcode 1309009268)
Preamp: 4440
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7752267 V     T = -25 °C: 345.5613887 V
Voltage for Gain 150: T = +20 °C: 388.5760542 V     T = -25 °C: 352.9551745 V
Voltage for Gain 200: T = +20 °C: 392.9265137 V     T = -25 °C: 357.0970932 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585165857 V-1     T = -25 °C: 4.924873878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.838044875 V-1     T = -25 °C: 9.914207278 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.00973351 V-1     T = -25 °C: 15.31141285 V-1
Break-through voltage: T = +20 °C: 407.1526447 V     T = -25 °C: 371.6008685 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:20 CET jreher Updated box and position via API.
03. Feb 2021 18:16:29 CET jreher Updated box and position via API.
11. Aug 2020 17:22:55 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:39 CET jreher Updated box and position via API.
27. Nov 2019 19:32:57 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
15. Jul 2019 15:47:23 CEST jreher Assigned to unit by script
15. Jul 2019 15:24:35 CEST jreher Assigned to capsule by script
04. Jul 2019 11:08:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.