RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2414027082 - Archived data from Wed, 07. October 2020 14:22:36 CEST


This is all the information about APD 2414027082. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2414027082
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2313025243/2414027082
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 20
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0380574 V     T = -25 °C: 345.5589416 V
Voltage for Gain 150: T = +20 °C: 388.8313876 V     T = -25 °C: 352.9153687 V
Voltage for Gain 200: T = +20 °C: 393.1620128 V     T = -25 °C: 357.0320776 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.510015115 V-1     T = -25 °C: 4.956089823 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.683829523 V-1     T = -25 °C: 9.08854078 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71865947 V-1     T = -25 °C: 15.62088256 V-1
Break-through voltage: T = +20 °C: 408.4411148 V     T = -25 °C: 371.9190388 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:50:20 CET jreher Updated box and position via API.
03. Feb 2021 18:16:29 CET jreher Updated box and position via API.
07. Oct 2020 14:22:36 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:52 CEST jreher Updated box and position via API.
11. Aug 2020 17:22:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:32:57 CET jreher Updated APD location via API.
25. Nov 2019 17:12:26 CET jreher Updated box and position via API.
04. Jul 2019 11:08:53 CEST jreher Updated APD location via API.
12. Jun 2019 16:46:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:31:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:10:00 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:44 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:48 CET Tobias Imported from Hamamatsu datasheet.